Parks Development Update

65 Acre Park:
The 65 acre Community Park located at Rainbow and Lower Buckeye Roads will be built in phases with phase one consisting of lighted multi-use ball fields and parking. Construction is anticipated to start in the Fall of 2009.

Canal Trail:
Design has begun on development of a canal trail on the north side of the Buckeye Irrigation District (BID) canal. A $58,000 grant was obtained from MAG for the design of the trail that will be between Miller and Baseline Roads. Design is anticipated to be completed by December 2009. 