Canal Trail:
Design has begun on development of a canal trail on the north side of the Buckeye Irrigation District (BID) canal. A $58,000 grant was obtained from MAG for the design of the trail that will be between Miller and Baseline Roads. Design is anticipated to be completed by June 2010.
|