City of Buckeye
Home MenuProtect I-10 Funding: Keep Buckeye Moving
I-10 Is Already Over Capacity
More than 140,000 vehicles travel through Buckeye daily on Interstate 10, a staggering 40% increase from just two years ago.
The cost of this growth is measured in more than just minutes lost to delays. When this stretch of I-10 hits capacity, it becomes a danger zone. Between 2021 and 2025 alone, the combination of abrupt stops and hindered emergency response led to 1,145 crashes between Citrus Rd. and Verrado Way.
Despite these risks, the solution, a fully funded and planned additional lane, is now being stalled. What was once a settled safety project is now being used as a bargaining tool in the state budget.
Buckeye’s growth isn’t slowing down. Traffic isn’t slowing down. Safety improvements shouldn’t be delayed.
Contact Your State Legislators and Governor's Office
We encourage residents to respectfully contact Arizona's state leaders and ask them to:
- Protect the full funding for the I-10 added lane between SR-85 and Citrus Road
- Keep the project in this year’s state budget
- Prioritize traffic safety and mobility in Buckeye and the West Valley
Use these links to send a message to Arizona state leaders and urge them to protect the funding for the I-10 Widening Project:
Clicking the links above will open a pre-filled email in your default email application. You may personalize the message before sending.
If your email provider is having difficulty loading the sender list, you can manually copy and paste the addresses from this document.
Project Overview
The Arizona Department of Transportation (ADOT), in coordination with the Maricopa Association of Governments and the cities of Goodyear and Buckeye, is currently designing improvements to I-10 from SR-85 to Citrus Rd.
The project is designed to:
- Increase capacity by adding a High Occupancy Vehicle (HOV) travel lane
- Improve safety by adding a concrete median barrier
- Add median lighting where applicable
This is a planned, coordinated regional improvement, not a new idea and not an unstudied concept.
Project Funding
In Fiscal Year 2023, the Arizona State Legislature approved $108 million for the project. The funding was initially planned for Fiscal Year 2025 but was later deferred to Fiscal Year 2028, marking the first delay in advancing these critical improvements.
Since the original Fiscal Year 2023 estimate, construction costs have risen. The total project cost is now estimated at $146 million.
Recognizing the urgency of congestion and safety concerns, state lawmakers accelerated the project funding schedule and appropriated $133 million over three fiscal years (2026 - 2028) to move construction forward sooner.
The current state funding schedule is:
- Fiscal Year 2026: $27 million
- Fiscal Year 2027: $30 million
- Fiscal Year 2028: $76 million
In addition, Buckeye and the Maricopa Association of Governments have committed a combined $10 million in local and regional funding toward the project.
This is not a new request. This is a previously approved investment now at risk of being taken off the table.
Project Elements
The proposed improvements include:
Between SR-85 and Verrado Way:
- Adding an HOV lane
- Installing a concrete median barrier
- Adding median lighting
- Widening the existing pavement to the inside
Between Verrado Way and Citrus Rd.:
- Adding an HOV lane
- Adding median lighting
- Widening the existing pavement to the outside
Additional Improvements:
- Widening the westbound I-10 bridge over Citrus Rd.
- Additional lighting throughout the corridor where applicable
- Noise abatement where warranted
These improvements are focused on both capacity and safety, addressing current congestion while planning responsibly for continued growth.
Why This Project Matters
Public Safety
- Reduces stop-and-go conditions that lead to crashes
- Improves emergency response access
- Adds a concrete median barrier to reduce cross-median incidents
- Improves visibility through added lighting
Mobility & Traffic Flow
- Improves commute reliability
- Reduces congestion at the SR-85 interchange
- Keeps regional commerce moving
Planning for Growth
- Buckeye is one of the fastest-growing communities in the state and country
- Infrastructure must keep pace with current demand